CE-BOND annular flow diverter installed on casing in an eccentric annulus
CE-BOND

Better cement. Stronger wells.

CE-BOND redistributes annular flow to improve cement placement in challenging wells, including highly deviated and extended reach applications.

Improved cement qualityField applications show improved cement evaluation response across selected equipped intervals.
Improved cement placementRedistributes annular flow to support improved low-side displacement.
Proven in challenging wellsField deployed in highly deviated and demanding well geometries.
The problem

Why cement placement becomes difficult.

In deviated and eccentric wellbores, uneven annular geometry can create significant differences in circumferential flow velocity, increasing the risk of poor low-side displacement.

Explore Centraflow

Technology, field evidence and specialist engineering.

Use the dedicated pages below for the detailed CE-BOND technical basis, selected field case histories and Centraflow engineering support.

Technology

How CE-BOND works, self orientation, flow testing, modelling, installation and application inputs.

Explore technology โ†’

Case Studies

Selected field evidence across different casing sizes, well geometries and operating environments.

View case studies โ†’

Engineering

Specialist support around cement placement, cement evaluation, annular flow modelling and technical assurance.

Explore engineering โ†’
Centraflow Engineering

Specialist cement placement engineering, beyond the product.

Centraflow also supports operators with focused engineering around cement placement, cement evaluation, annular flow modelling, centralization, casing movement and technical assurance. The engineering starts with the well challenge, not with a predetermined technology.

  • 01
    Cement placement engineering

    Review geometry, standoff, fluid hierarchy, rates and displacement risk.

  • 02
    Cement evaluation

    Interpret acoustic and ultrasonic response and translate findings into placement lessons.

  • 03
    Annular flow modelling

    Assess eccentric annulus hydraulics and circumferential velocity distribution.

  • 04
    Technical assurance

    Independent review of cementing and barrier programmes before execution.

Work with Centraflow

Contact Centraflow

Contact us for CE-BOND application support, technical discussions, partnerships or general enquiries. For a specific well or project, provide the available application details below.

Centraflow ยท Energivegen 10, 4056 Tananger, Norway
centraflow.no

Your enquiry is sent directly to Centraflow.

CE-BOND ยท Annular flow redistribution for challenging cement placement